Euromedia24 on Play Store Euromedia24 on App Sore
BNB

$870.47

BTC

$113082

ADA

$0.868816

ETH

$4608.63

SOL

$213.76

31 °

Yerevan

20 °

Moscow

45 °

Dubai

20 °

London

26 °

Beijing

23 °

Brussels

16 °

Rome

23 °

Madrid

BNB

$870.47

BTC

$113082

ADA

$0.868816

ETH

$4608.63

SOL

$213.76

31 °

Yerevan

20 °

Moscow

45 °

Dubai

20 °

London

26 °

Beijing

23 °

Brussels

16 °

Rome

23 °

Madrid

1 billion 371 million 352 thousand drams have been allocated for 3 subsidy projects in Shirak region


In the Ani community of Shirak marz, 3 subsidy programs with 9 sub-programs, with a total value of 1 billion 371 million 352 thousand drams, were launched in 2024 with state-community cooperation. The proportion of the RA government is 648 million 439 thousand drams, 47.3 percent.

It is reported from the regional governor's office, detailing:  "Construction/repair of drinking water supply and drainage system

• Works on the construction of sewer lines in the city of Maralik are in progress. • The estimated cost of the city sewer line construction project is 174.2 million drams, the Government will allocate 65 percent of the amount, the proportion of the community is 35 percent.
• 2000 beneficiaries will benefit from the project, a 4232 m long sewer line will be built. Construction/repair of residential streets, asphalting
• Construction works of roads in Sarnaghbyur, Sarakap, Haykadzor settlements are in progress, and Hr. The fundamental repair of Shahinyan Street is in the stage of signing an agreement.
• Estimated cost of the residential street paving project is 1 billion 127.2 million drams (contractual cost is 656.7 million drams), 45 percent of the amount is the proportion of the RA government, the community will allocate 55 percent.
• As a result of the project, a road with a length of 5328 m will be asphalted. Repair of the roofs of multi-apartment buildings.
• The construction works of repairing the roofs of 4 multi-apartment residential buildings in Maralik city are in progress.
• The estimated cost of the roofs of 4 apartment buildings in the city is 70 million drams, of which 40 percent is the proportion of the RA government, the share of the community is 50 percent, residents of the apartment buildings will allocate 10 percent.
• 912 residents will benefit from the results of the project, 3310 square meters of roof will be repaired."

News

Hamas is ready to withdraw its forces from the Israeli-controlled areas of Gaza
Nigeria to raise billions of dollars to fight global warming
The air temperature will rise gradually
Armenia has done everything to get the Russian peacekeepers out of Artsakh. Kocharian
With the November 9 document, it was possible to keep Artsakh, Pashinyan refused. Kocharian
Israel has announced that the Turkish army will not participate in stabilization efforts in Gaza
Whose interests does the RA government serve? Armen Ayvazyan
Internet and mobile phone services have been cut off in Gaza
A helicopter crashed in the USA
Next Sunday, Pashinyan will participate in the liturgy in the Church of the Holy Mother of God in Khachik village (video)
The US has stopped supplying weapons to Ukraine and its NATO allies. Axios:
"If I meet you, Nikol Pashinyan will eat me." Araik Harutyunyan refused to meet Kocharyan
We are not a fearful species. Reaction of "Mother Armenia" candidates to the "case" made by the National Security Service (video)
Andranik Martirosyan became European champion
"Van" defeated "Gandzasar"
The treasures of the depository-museum of St. Etchmiadzin Cathedral
Big car accident in Kotayk region
Vagharshak Keyan, European boxing champion
The people are the core of our life and the purpose of our service, surrounded by the presence of Christ. Aram I
Steinmeier spoke about the threat to German democracy